Selected Projects

Built Systems.
Visible Craft.

Before-and-after transformations and carefully organized mechanical work from Drip 3.0.

01   Before & After 02   Mechanical Systems 03   Radiant Heating

01 / Transformation

Boiler & Mechanical-Room Transformation

An aging, crowded mechanical room was replaced with a cleanly organized boiler system, storage tank, and copper distribution layout designed for clear service access.

Boiler and mechanical room before the Drip 3.0 upgrade
BeforeExisting Mechanical Room
Boiler and mechanical room after the Drip 3.0 upgrade
AfterCompleted Boiler Installation

02 / Mechanical Systems

High-Efficiency Dual-Boiler Installation

A two-boiler installation with dedicated circulators and carefully routed copper supply and return lines. The system is organized for clarity, access, and future service.

Discuss A Project
High-efficiency dual-boiler installation by Drip 3.0
Dual-Boiler InstallationMechanical Systems
Radiant floor heating tubing installation by Drip 3.0
Radiant Floor HeatingIn-Floor Installation

03 / Heating

Radiant Floor Heating Installation

Radiant-heating tubing laid out across insulated panels before the finished floor, bringing heat directly into the occupied space.

Call Drip 3.0

Project inquiry Step 1 of 2

How can we help?

Choose the type of work so we can ask the right questions.

What kind of work is this?